What’s in this kit
Proposed complete kit contents
Proposed contents only. The final supplied items and quantities will be confirmed before ordering opens.
-
1 × Correctly sized reusable AC wash cover
Selected by actual indoor-unit width, depth and required mounting clearance; water-collection construction with drain outlet; selected fit and seam performance pending
Collect technician-generated runoff below and around the compatible unit -
1 × Matched cover mounting/support set
All brackets, clips, cords or elastic fittings required by the selected cover design; exact component count pending
Support the cover without relying on a missing accessory -
1 × Upper splash shield
Integrated upper section of a suitable full cover, or a separate compatible upper shield; confirm actual upper-wall and ceiling coverage
Limit splash above the unit; a bottom-only open bag does not perform this role -
1 × Compatible drain hose with outlet fittings and retaining clip
Target about 2.5-3 m; bore and adapter must match the cover outlet; exact supplied length and connection pending
Direct collected wastewater into a stable receiving bucket -
1 × Waterproof work mat
Target about 1.8 x 2 m; impermeable backing; choose verified slip-resistant working surface and edge containment for the actual job
Protect the floor below the work area and catch incidental drips -
1 × Wall-protection sheet
Target about 1.35 x 2.5 m; extend behind and below the unit; material suitable for temporary splash protection
Protect wall finishes along the runoff/splash route -
1 × Pre-taped PE masking-film roll
Target 550 mm x 25 m for local shields; verify selected film and adhesive
Add local upper/side shielding as required by the cover geometry -
1 × Wide furniture-protection sheet
Sized to cover the nearby furniture and belongings; smooth water-resistant plastic barrier, not an absorbent dustsheet alone
Protect surrounding belongings from splashes and dust -
1 × Low-tack protective tape roll
Target 48-50 mm x 25 m; surface-appropriate removable protective/masking grade
Temporarily secure protective material after a discreet surface test -
1 × Approved plastic-film seam tape roll
Moisture-resistant tape compatible with the chosen film; supplier-approved film-to-film overlaps; exact grade pending
Join protective film overlaps where required; do not apply strong sealing tape to delicate painted surfaces -
2 × Stable handled collection/preparation buckets
Target 10 L each; clearly labelled Clean Water and Wastewater; stackable only if safely stable in use
Keep clean water separate from collected wastewater and allow monitored collection -
1 × Flat bristle brush
Verify non-metal bristle material and permitted use; do not assume safe on fins or coatings
Remove loose dirt from manufacturer-approved accessible/removable surfaces -
1 × Soft non-metal detail brush
Non-metal bristles; selected brush shape and softness to confirm before launch
Brush manufacturer-approved accessible narrow details -
4 × Colour-coded microfibre cloths
Suggested split: 2 cleaning cloths and 2 dry finishing cloths; verify care instructions
Keep dirty wiping separate from final drying -
2 × Absorbent finishing pads
Suitable for clean-water incidental drips; compatible with any cleaner residue actually used
Handle small drips during removal and final floor checks -
1 pair × Reusable cleaning gloves
Choose material and thickness compatible with the selected cleaner SDS; one pair means two gloves
Protect hands during the permitted cleaning and handling tasks -
1 × Liquid-splash goggles
Indirect-vented splash-protection model; verify standard and fit for actual use; ordinary open safety spectacles are not the same protection
Protect eyes from cleaning splashes -
1 × Splash apron
Reusable liquid-resistant material compatible with the job
Reduce wetting of clothing during handling and cleanup -
2 × Waste bags
Correct size for used disposable masking materials; not a wastewater container
Collect dry/appropriately handled used consumables -
1 × Washable storage bag
Sized after assembled-kit packing verification; store only clean dry reusable items
Keep the coordinated tools together between jobs -
1 × Illustrated fit, containment and finish checklist
Cover-fit diagram; masking-tape role; hose/bucket setup; dry-off and tool-care checks; technician-only internal-work boundary
Help the buyer understand the full task and items needed separately